Investigating the 10-plus sieverts/hour radiation at the bottom of the main exhaust duct for the Reactors 1 and 2 at Fukushima I Nuclear Power Plant, TEPCO announced on August 4 that 3.6 sieverts/hour radiation was detected at the drain pipe that connects to the bottom of the main exhaust stack for Reactors 1 and 2.
The pipe is for draining rainwater from the bottom of the exhaust stack. 3.6
No comments:
Post a Comment